PS2- Church Institute Site
Our first strategy section highlights the vertical moment we have designed at the centre of the building. The light well we are proposing to reinstate is currently sealed off at first floor level. It will remain an internal space but will extend down to the basement and up above the existing roof. The main route from the front to the back of the building passes through this space. From this diagram you can see the existing front facade and first floor hall we are retaining.
Our first strategy section highlights the vertical moment we have designed at the centre of the building. The light well we are proposing to reinstate is currently sealed off at first floor level. It will remain an internal space but will extend down to the basement and up above the existing roof. The main route from the front to the back of the building passes through this space. From this diagram you can see the existing front facade and first floor hall we are retaining.
Posted 12 Feb 2021 10:54